This paper tries to give answers to all the questions that have been asked by the public so far. If there is not an answer to your question please contact us. As the work develops some of these may change.  
Johnnie Grant of Rothiemurchus
Johnnie Grant of Rothiemurchus
 
 
What is An Camas Mòr?
  • A Proposed New Community at An Camas Mòr; it would include space for up to 1500 residential units(subject to regular review) with associated business and community facilities and infrastructure provision and would be completed by 2027.
Where can I see the plans?
  • There are no detailed plans yet; however application for Outline Planning Permission has been made and the plans Proposed Masterplan may be seen at the offices of The Highland Council, Kingussie and the Aviemore service point as well as on this website.
Where is An Camas Mòr?
  • It is on the other side of the River Spey from Aviemore and would be initially accessed by road from the Coylum Bridge to Nethy Bridge road and, more directly, by a new off road path and cycle route from close to the Rothiemurchus Fishery entrance where there would be a new road from the electricity substation across the Dell Farm to An Camas Mòr.
Who is it for? What are the Jobs?
  • It’s designed for people who live in the area and are seeking a house or business premises and people who come to the area to work in them as identified in the Cairngorms National Park Authority Draft Local Plan and accompanying documentation.
  • Through a public private sector partnership approach new employment would be brought to An Camas Mòr.
When would it happen?
  • From 2011 and it is expected to accommodate the needs for new housing and premises in the area for 20-25 years.
Most developers and builders have stopped work due to lack of finance for either building or mortgages; why is this application being made now?
  • An Camas Mòr is being planned in outline only on the basis of indicative plans.  Should permission be granted, it is expected to be built in the period 2011-2026 following the detailing of plans and the granting of detailed permission; people will carry on having children and business is likely to continue to grow in the area so we see no valid reason to stop this outline planning process now.
What happens if there is a financial down turn when An Camas Mòr is half built?
  • One of the reasons for starting in the East is that An Camas Mòr could be a small hamlet from the start, including work space and homes and community space appropriate for its size.  The design would enable it to grow incrementally from this into a village with a population similar to that in Aviemore; the first economic phase would be likely to include about 400 homes.
Will An Camas Mòr become the new focus leaving Aviemore with inadequate and aging community facilities?
  • The start of An Camas Mòr would enable the opening up of the Aviemore Park with access to space for playing fields and other recreational activity.  So An Camas Mòr could be of considerable benefit to Aviemore community facilities.  How and to what extent future community facilities would be provided would depend on the success of community initiatives.
What principles are being followed?

An Camas Mòr would be planned to be:

  • Responsive to local need - the idea came from the local community and The Highland Council. The Council considered other locations and decided in favour of An Camas Mòr.
  • Designed comprehensively and delivered in the long term in accordance with the design principles agreed at the outset;  Aviemore has continued to develop on a piecemeal basis in spite of the earlier belief that it was already large enough.
  • Aim to be sustainable - An Camas Mòr would provide the opportunity for a carefully planned community to use environmental excellence to care for the natural heritage and meet the everyday needs of the people who live and work in the area. The EIA includes a sustainability report.
  • Inclusive - by working with the community and those who might live there, plans would be developed that can provide a wide choice of accommodation ranging from social housing, starter flats and homes to the self build plots that can lead to a balanced community. There would also be space for working from home, workshops and community facilities.
  • Inclusive- by giving recognition to the national debate on the use of shared street surfaces and the need for kerbs.
What would it be like?
  • Houses, plus sports, community, shops and other business facilities.
  • Look at the Proposed Masterplan and note that the architect practices around the World and brings that experience to designing places for life, spaces and buildings in that order. He has worked closely with the local community and specialists. Note that the vision was developed over a period of years some time ago and although the architectural principles have not changed the outline planning application differs as a result of new policy, studies modeling, testing and consultation.
  • It would be built using environmentally sustainable principles and have a regular public transport service from the start.
  • All the buildings would be planned to be set within a woodland setting and would relate to tree heights.
  • It would be well screened from Aviemore and other lowland viewpoints by existing woodland and new planting.
  • By taking a short cut through the proposed new Aviemore Countryside Park the centre of An Camas Mòr could be within a 20-minute walk of Aviemore railway station.
  • The team would continue working with the community over the planning process to influence the eventual shape of the settlement.
Who is it for?
  • It would be designed to appeal to a wide range of local people of all ages and interests, as well as people who wish to join the community.
Why build so many houses?
  • It is planned to provide for the housing need for a long period.  An Camas Mòr would start off as a small settlement but it would be clear that it could get bigger and people would know where it would stop.  In terms of new settlements in the UK the proposed 1500 homes is not large; other new planned settlements are in general three times that size. 
  • There is not enough accommodation to meet the needs of people who want to live and work in the area and by planning ahead for 20 years plus An Camas Mòr can be a much better place.  The annual need for affordable housing that has been estimated by the Heriot Watt study for the Cairngorms National Park Authority has confirmed that the area needs An Camas Mòr to happen over the next 20-25 years.
  • The main growth of Aviemore started in the 1960s when the opening of the Cairngorm Ski Road and Chairlift enabled it to develop as an all the year round tourism destination.   For a hundred years before, its main industry was based on being a railway junction, north, south and two routes to the east until the latter and the workshops were closed in 1958.  The new Aviemore Centre gave visitors and residents of a tiny Highland village, leisure facilities that were rare even for the largest cities and attracted a large number of residents attracted by wide range of employment opportunities as well as the winter sports.
  • Unfortunately the necessary bold long term planning for infrastructure required for the influx in the 1960s and 70s was apparently not taken because it was felt that the growth should be focused on other villages in Badenoch and Strathspey where there were already established communities.  Aviemore kept growing in spite of this presumption against development and the result was that many essential workers could only find accommodation in substandard housing such as caravans.  Eventually this was addressed by the addition of housing estates timed according to the availability of services such as waste water treatment and funding for affordable housing but development was frequently crisis led and lacked community facilities; not part of a long term plan.  An Camas Mòr aims to get it right and that should enable Aviemore to mature into a place with facilities appropriate for a place of its size and for its position as the hub of Badenoch and Strathspey. 
  • Aviemore & Vicinity Community Council became so concerned about the situation that in the 1970s it approached private house builders and British Rail - a major landowner and as a result the shopping centre beside the railway was built and the Dalfaber Estate was begun.  After years of sustained lobbying the doctor’s surgery eventually moved from a portacabin to a purpose built facility on land owned by the village hall.
  • The proposal in 1989 for An Camas Mòr came from and has been consistently supported by the Aviemore and Vicinity Community Council, when it proposed that a bold step should be taken by planning for a long time ahead.  After studying alternatives The Highland Council recommended that a new planned community should be established at An Camas Mòr from 2005 and after examination at the public enquiry it was adopted into planning policy.
  • For many years the lack of housing within easy reach of work has been a major problem for local people and businesses; the Local Plan identifies An Camas Mòr as answering local housing needs for 20-25 years.
  • New housing is required for the projected population growth in the Aviemore area which was identified by the Highland Regional Council in 1989 and confirmed in 2001 and again by the Cairngorms National Park Authority.  Some of this data would be in An Camas Mòr socio economic study.
  • Local people want space for more sports and community facilities.
Does it have Planning Permission?
  • No, it is included in the Local Plan following a Public Planning Inquiry in 1994 which confirmed the housing need and identified An Camas Mòr as the most appropriate location for a new settlement.
  • The Highland Council Structure Plan, which also supports the development of An Camas Mòr, was approved by Scottish Ministers in 2001, following their decision to create a Cairngorms National Park.
  • An Camas Mòr forms part of the Highlands' housing strategy.
  • It is included in the Cairngorms National Park Authority Draft Local Plan 2008.
  • An application for Outline Planning Permission is current as at May 2009.
Why at An Camas Mòr?
  • During the Local Plan consultation process, chaired by Aviemore and Vicinity Community Council in 1989, the local community expressed a preference for a new site, across the River Spey. This view has been consistently sustained ever since.
  • The Highland Council examined five locations and selected An Camas Mòr as the preferred site.
  • Aviemore is constrained by the A9, the railway and the river and has become very elongated.
  • An Camas Mòr is close enough to share community facilities with Aviemore.  It would have a regular public transport service to Aviemore for the first phase. The centre would be a 30-minute walk from the mainline railway station.
  • An Camas Mòr would be designed as a sister community to Aviemore, sharing some of the main infrastructure facilities - Aviemore has the school and health and transport centre, while An Camas Mòr can provide space for sports and other community facilities.
  • Being planned from the start, it would accommodate the needs of the area minimising impact on the wider environment.
When?
  • The draft local plan seeks the first 100 houses by 2011, the proposed masterplan envisages that 430 homes and associated community and commercial premises would be complete by 2016.
How?
  • Rothiemurchus Estate and now An Camas Mòr LLP has been working in partnership with many different commercial, conservation and public sector specialists and agencies as well as the community council to encourage a truly partnership approach to this development.
  • Over the past three years, An Camas Mòr LLP has invested in substantial research into wildlife and habitat, access, housing, land use, engineering, social and economic and archaeological and landscaping issues. Details of these accompany the application and are listed as technical reports on the website.
What would be the relationship with Aviemore?
  • An Camas Mòr would therefore start as a small hamlet, perhaps grow to the population of, say, Boat of Garten in some years from now and depending on economic conditions continue to grow in a pre planned way over a generation.  An Camas Mòr would be a community in its own right, but by virtue of its location it would have a special relationship with Aviemore and the Aviemore and Vicinity Community Council wish is that the communities should come together for recreation, sport and other services. 
  • Between Aviemore and An Camas Mòr lies the River Spey with its 300 metre wide flood plain:  within the local plan (1997) an area is identified on either side of the River Spey to be safeguarded as Parkland for amenity, leisure and agricultural purposes.  For the community of Aviemore there is immediate potential for playing fields, paths and riverside woodland enhancement.  Various parties are currently active in pursuing the realisation of this aspiration and there is the proposed indoor multi sports centre that could also be accommodated.  Fundamental is a new foot/cycle bridge across the River Spey with a path directly linking central Aviemore to playing fields and on to An Camas Mòr to help the communities to come together.  The masterplan for An Camas Mòr would acknowledge this objective and Rothiemurchus Estate is keen to join with others to enable it.
  • An extensive socio economic study would report on the impact of An Camas Mòr.  Aviemore should benefit from a wider range of housing opportunities which are currently a significant constraint on employers’ ability to attract suitable staff, business, new employment attracted to An Camas Mòr; the wait for housing should be substantially reduced.
  • The River Spey flood plain prevents Aviemore and An Camas Mòr from being physically close, but the sharing of facilities and services and especially the proposed Countryside Park would help bring the communities together.
  • Facilities and services would be shared; the school, main supermarket and health centre would be in Aviemore and the playing field and other recreational facilities would be at An Camas Mòr. When An Camas Mòr reaches 600 homes it would be expected to require a new primary school. (Note that it is planned for Aviemore to have a new school at the village hall site in the next few years.)
What about the capacity of the school, health facilities and other services in Aviemore?
  • The socio economic study  includes a report on the capacity of all existing facilities and services.
  • The An Camas Mòr Proposed Masterplan contains a chapter on education; any questions relating to schools should be directed to Highland Council.
  • The provision of additional health services is a matter for NHS Highland.
  • The overall vision includes a community wood fuel heating plant however that is seen as something for the future and it would be the subject of a separate assessment and planning application.  Also other sources of energy saving and generation would be investigated.
Would it impact on other local communities?
  • A local business survey has been carried out and the impact on other communities would be addressed by the socio economic report.
How would it be accessed?
  • An Camas Mòr is planned to be built over 20-25 years but needs to start small and the team considers that for it to be sustainable the best place to do that is as an independent hamlet, with job opportunities within it, located at the East End set back from the road from Coylum to Nethy Bridge.
  • A public transport system would be in place from day one. At the detailed planning stage alternative forms of “green” transport would be considered.
  • By road it is little over 2 miles from the South Aviemore Roundabout and approx 3.5 miles from the A9.
  • By Foot and cycle paths the first phase would be under two miles from the Aviemore railway station via the Old Bridge Inn or one and a quarter miles through the proposed Community Park. The path could be separated from the busy main roads as far as the Dell of Spey, beside the Police Station.
  • Policy 6.1.6 of the Local Plan requires the Coylum Bridge junction closure and road realignment to be included in the Master Plan for An Camas Mòr. The applicants have therefore included this in the proposal.
  • The developers of Coylum Road were required to form the junction with the ski road to the standard required in preparation for the realignment of the B970.
  • For many years there was a proposal that the only road to An Camas Mòr should be via a turn off at the fishery. Discussions with The Highland Council Roads department and others in 2008 led to there being a recommendation for two routes, starting with the Coylum Bridge realignment for the first phases, then by developing a construction route probably via the Inverdruie electricity substation and to be completed by building that route into a through road to join with the Nethy Road at the East end of the An Camas Mòr High Street.
  • The existing junction at Coylum Bridge would be closed to motor vehicles which would access these houses from the other direction, connecting to the realigned road approximately 350 metres North of Drumchork.
  • It is likely that the need and timing for these routes would be a matter for discussion during the formal planning processes
Would there be a new bridge across the Spey?
  • There has been a consistent view expressed by the Community Council that there should at some time be a new road bridge to the North. This is not in the Local Plan and would not be needed for or justified by An Camas Mòr, however An Camas Mòr has been sited so that this possibility is not ruled out as an option for the future. 
  • The proposed Community Park requires community leadership and is not part of the An Camas Mòr application, but it would be supported by Rothiemurchus Estate and it is expected that An Camas Mòr would make an appropriate contribution.
How would it impact on the B970 to Nethy and elsewhere?
  • The socio economic study and transport assessments  give further information on the impact on existing roads and communities.
Would it be a blot on the landscape?
  • An Camas Mòr would be a woodland community. It would be almost entirely screened by trees from roads and places which people usually visit.  It would be seen from the top of Craigellachie Hill and other elevated viewpoints.
  • Houses would be set back 30 metres from the B970 road behind trees; the end of the High Street would come closer to the road and very great care would be taken in the design of buildings at that location.
  • The Coylum Bridge Hotel and timeshare is a good example of buildings in woods; it was built on sparsely wooded moorland in 1960 and is a helpful comparison.
  • The landscape assessment technical paper provides further detail.
What types of housing would be available; would it be full of second homes?
  • A full range of housing types would be designed from starter homes to large family houses.
  • Different types of ownership are envisaged – rental, part-ownership and full ownership – in line with the Draft Local Plan.
  • Detailed discussion would come later before detailed planning permission is applied for.
  • It is a legal requirement for all new housing to be fully accessible for all, with no barriers for those with specific needs.
  • Design, marketing, rate of development and legal conditions of ownership would be planned to prioritise those who want to live and work in the community.  We have not found a way to curtail second home ownership but expect that the design and marketing of the new community would favour full time residents.
Are you considering the needs of people of all ages?
  • People coming up to the house buying stage have taken part in a group meeting set up specifically for them and they have expressed considerable enthusiasm for An Camas Mòr. More ideas for other ways of consulting with all age and other groups would be welcome. This would be especially relevant at the detailed planning stages.
  • Older people’s needs, such as sheltered housing or care facilities, are planned to be on the agenda at the detail stage and we are very keen to see a range of facilities for older people included in An Camas Mòr. 
  • Space for recreational facilities and opportunities would be available to all.
  • Public transport would be provided from the start.
What facilities would be available?
  • There would be the opportunity for a range of recreational facilities and for new businesses.
  • Facilities and services would be available to all, and we envisage that there would be some specifically for: older people, younger people, families, the business community and visitors.
  • An Camas Mòr would provide space for outdoor recreational facilities and encourage new enterprise to establish other facilities and services.
  • The Community Park would be accommodated by Rothiemurchus Estate.
What about the Cultural and Environmental Heritage of the site?
  • National Park aims include conservation of the natural and cultural heritage and promotion of sustainable use, recreation and education, and the well being of local communities, all of which must be taken together. So part of that is enabling provision of homes and jobs with prospects for local people.
  • Central to this is that the vision is for a woodland community on a tight footprint in one place. This should make it easier to avoid development sprawl elsewhere.
  • The archaeologist has not identified any important features that cannot be avoided or mitigated for. 
  • There has been an ecological study carried out over a period of 4 years and the report  highlights special action that needs to be taken.
  • The site is not as important in ecological terms as the rest of Rothiemurchus; when it was included in the local plan the estate planted trees on the bare areas to complete the woodland setting for the community.  Discussions are taking place to establish how best to mitigate the effects of building both on site and off site.
  • The site has an attractive area of woodland in the South and this would not be developed.  Bridges would be built so as not to impact on the rivers and there would be many other avoidance, enhancement and mitigating measures.
  • It is inevitable that habitat would change, and how this is managed and its effects mitigated would be explained in the ecological assessment.
How is climate change addressed?
  • The community would be on a tight footprint making efficient use of land.
  • It would be sustainable as a small village and designed to grow in an organised way according to need.
  • The feeling of a community in woodland would be retained as much as is practicable and the planting of trees would be encouraged, the vision is more like the Coylum Bridge Hotel grounds than the Aviemore environment.
  • The High Street would be East West, not straight, so that it provides shelter and catches the sunshine.
  • Modern building regulations require houses to have a low carbon footprint.
  • The use of timber for walls would be encouraged.
  • Many houses would be joined up to minimise heat loss.
  • Nearly all houses would be within a 5 minute walk of a busy High Street so that it easy to leave the car at home.
  • There would be an attractive off road path to Aviemore and also one through the proposed Aviemore Countryside Park.
  • There would be public transport connection to Aviemore from the start.
  • The community would be within easy cycling distance of a main line railway station.
  • The vision includes a wood fuel community heating plant; subject to EIA etc.
  • As the detailed masterplanning starts after the granting of outline planning permission it is expected that other possibilities would be added to this list.
How can I learn about it and have my views taken into account?
  • In recent years the Cairngorms National Park Authority has consulted on this proposal as part of the Local Plan consultations. A lot can be read on its web site under the Local Plan section.
  • The An Camas Mòr website was set up in 2006 and has been a source of information for all since then; it continues to be updated.
  • There have been three public meetings that have been well covered in the Badenoch and Strathspey Herald and there was a Drop in Session on 12th February 2009 for viewing the plans to be included in the application. There have also been special meetings with for example younger people who aspire to own a home. 
  • We continue to listen to our partners and are always happy to receive your comments however the indicative plans on which the EIA is based are now being fixed.  New ideas that affect that would from now have to have their own environmental impact study and assessment independently of the proposal as it stands.
  • Should outline planning permission be granted, we would start detailed planning and would want to consult with a wide range of people to help with that.
What would make it different and the place to be?
  • An Camas Mòr has been designed by David Sim of Gehl Architects with people from within the local community. David is Scottish and decided to work in Denmark because he holds considerable respect for Scandinavian design. He specialises in helping communities around the World design better places to live, starting by considering life and life style, spaces between buildings and then the buildings; see www.gehlarchitects.com    
  • David has worked since 2005 with the Aviemore community and local specialists from the private and public sectors to learn about the area, its special qualities and its needs and to develop an outline masterplan; it is not an idea designed for somewhere else; it has been designed by working from first principles and by applying them in a way that meets the needs of the people at this place at this time and as they perceive the future.  The result should be a place of considerable character, would become widely known for that and would provide a great lifestyle for many.
How did the plans get to the stage they are at?

On discovering that the community wanted to cross the river to Rothiemurchus Johnnie Grant was not entirely happy about the idea.  However after some persuasion he understood the social and economic need and how a new village could transform the quality of life for local people and the wider image of the area. He therefore wrote to conservation organisations and spoke to many local people and others to see if they wanted it to happen, they very nearly all did.

  • The next step was to outline what the place might be like for the 1994 Local Plan Enquiry and in 1997 it reported in favour of a community in a woodland setting to be built from 2005.
  • Trees were planted and from 2003 work began on planning again.
  • The environmental studies were started in 2004 and Gehl Architects were appointed in 2005.  Public meetings were held in 2005, 2006, and November 2008.  Workshops, engaging specialists by invitation, were held on transport, landscape, housing, buildings, sustainability and public realm in summer 2008.  Much of this was done simultaneously with the Cairngorms National Park Authority consultations on the Local Plan which confirmed the wish for the proposal.
  • In June 2008 the Cairngorms National Park Authority Draft Local Plan timetabled 100 house completions for 2011 and the environmental studies began.  The team includes specialists on Archaeology, Ecology, Geology, Hydrology, Planning, Master Planning, Architecture, Landscape, Socio Economics, Housing, Engineering, Roads, Bridges, Drainage, Lighting, Traffic and Sustainability. 
Are you being over ambitious; will it ever be built?
  • There is a widely shared desire to see a new community that will meet the needs of the local people and the local economy and fit in its natural environment. Whilst the An Camas Mòr team believe that given reasonable economic conditions the proposal is feasible there is an urgent need for homes affordable for locally employed people that can be met with An Camas Mòr.  The Cairngorms National Park Authority Principles agreed for An Camas Mòr on 12.12.2008 include the statement “An Camas Mòr would show how private and public investment and a range of small and large developers would consistently work together when the land is no longer in one ownership, over all phases of the development, to create a new community with a distinct and cohesive identity and sense of place.”  It is believed that the public private partnership and the need for accommodation for local people and business would drive the development forward.